Answer :
construction : land : landscaping = 4 : 1 : 1/3 = 12 : 3 : 1
Then the land cost is expected to be 3/(12+3+1) = 3/16 of the total cost.
3/16 * 250,000 = 46,875
Your budget for the land should be about $46,875.